Download the app
← Latest news

CleanMax to power Shell sites with 30 MW hybrid renewables in Gujarat and Karnataka

Business
Published on 24 April 2026
CleanMax to power Shell sites with 30 MW hybrid renewables in Gujarat and Karnataka

Shell gets electricity from CleanMax hybrid plants built locally

CleanMax plans to supply renewable electricity to Shell’s LNG terminal in Gujarat and technology centre in Karnataka. The Gujarat site will be powered by a 16.83 MW solar and wind hybrid project, while Karnataka’s 13.2 MW hybrid plant will feed Shell’s Bengaluru operations. The move aims to improve reliability and energy stability for Shell’s facilities.

  • CleanMax will supply renewable power to two Shell locations
  • Gujarat hybrid project capacity totals 16.83 MW
  • Karnataka hybrid plant capacity is 13.2 MW for Bengaluru
  • The plan is designed to strengthen Shell’s energy reliability
Read the full story at The Economic Times

This summarization was done by Beige for a story published on The Economic TimesThe Economic Times

The full experience is on mobile.

Swipe through stories, personalise your feed, and save articles for later — all on the app.